User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
todo [2019-07-09 12:19]
tim
todo [2019-07-18 13:28] (current)
tim [Small Tasks]
Line 7: Line 7:
 These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  *+  * Inspect the fly zapper. If no issues found order new tubes.
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
Line 13: Line 13:
 These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull 4 CAT5e cables from G11 rack to G14 and install the access point.+  * Pull 4 CAT5e cables from G11 rack to G14 <del>and install the access point.</​del>​
  
 ===== Infrastructure Projects ===== ===== Infrastructure Projects =====
todo.1562674747.txt.gz ยท Last modified: 2019-07-09 12:19 by tim