User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2019-07-09 12:13] timtodo [2022-07-04 19:30] (current) MirZa
Line 1: Line 1:
 ====== To-Do (How can I help?) ====== ====== To-Do (How can I help?) ======
  
-See also [[https://roundup.ehlab.uk/|Roundup]] and the [[members_nights|Members' Nights]] list.+See also the [[members_nights|Members' Nights]] list.
  
 ===== Small Tasks ===== ===== Small Tasks =====
Line 7: Line 7:
 These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete: These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  *+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure). 
  
 ===== Bigger Tasks ===== ===== Bigger Tasks =====
  
-These should be immediately actionable, describable in a single bullet point and take up 1-3 hours for 1-2 people to complete:+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-  * Pull 4 CAT5e cables from G11 rack to G14 and install the access point.+  * Pull additional Cat5 cables from between G11 and G14. 
 +  * Tidy-up the radio corner. 
 +  * Fix Volume control / MQTT-IR bridge 
 +  * Fix Projector control 
 + 
 + 
 +===== Infrastructure Projects ===== 
 + 
 +  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it 
 + 
 +More tasks may be found on the [[start#projects|infrastructure project pages]].
  
 ===== Mini Projects ===== ===== Mini Projects =====
 +
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
  
 ==== Repair Tektronix oscilloscope ==== ==== Repair Tektronix oscilloscope ====
Line 32: Line 47:
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
  
 +===== Radio / Antenna TODO ====
 +https://wiki.ehlab.uk/roof
 +https://wiki.ehlab.uk/radio:projects
 +
 +===== Roundup =====
 +
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:
 +
 +
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 |
 +
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
todo.1562674408.txt.gz · Last modified: 2019-07-09 12:13 by tim

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki