todo
This is an old revision of the document!
Table of Contents
To-Do (How can I help?)
See also Roundup and the Members' Nights list.
Small Tasks
These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
Bigger Tasks
These should be immediately actionable, describable in a single bullet point and take up 1-3 hours for 1-2 people to complete:
- Pull 4 CAT5e cables from G11 rack to G14 and install the access point.
Mini Projects
Repair Tektronix oscilloscope
Scope has a power supply fault, and probably needs a capacitor replacement.
Repair Rigol DS1102D oscilloscope
One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
Other Stuff
- Design a test pattern for checking/calibrating the laser cutter
- Build a webapp to view Space API data
todo.1562674408.txt.gz · Last modified: 2019-07-09 12:13 by tim