User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2016-10-18 14:25] timtodo [2022-07-04 19:30] (current) MirZa
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also the [[members_nights|Members' Nights]] list.
  
-==== Drill organisation ====+===== Small Tasks =====
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing.+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-  * Make or buy an organiser: +  * Tidy and clear-out the kitchen cupboardShould only contain cleaning supplies
-    * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) +  * G1 hifi shelves: replace the short brackets with long brackets (we have surplus and the shelf would be more secure).
-    * Sections for HSS, brad-point and masonry +
-  * Audit the drillsDispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares+
-  * Identify suitable drill sharpening system to keep the drills in good condition.+
  
-==== Finish moving the workshop from G2 to G8 ==== 
  
-  * Clean the blue storage bins in G8 +===== Bigger Tasks ===== 
-  * Move the tools and supplies from G2 to G8 + 
-  * Organise the shelves in G8, label them so tools can be returned to the same place each time+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: 
-  * Move the chemicals from G1 to G8 (under the sink). Dispose of empty containers. + 
-  * Fit smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall).+  * Pull additional Cat5 cables from between G11 and G14. 
 +  * Tidy-up the radio corner
 +  * Fix Volume control / MQTT-IR bridge 
 +  * Fix Projector control 
 + 
 + 
 +===== Infrastructure Projects ===== 
 + 
 +  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
 +  * Add smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it 
 + 
 +More tasks may be found on the [[start#projects|infrastructure project pages]]. 
 + 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
  
 ==== Repair Tektronix oscilloscope ==== ==== Repair Tektronix oscilloscope ====
Line 25: Line 36:
 Scope has a power supply fault, and probably needs a capacitor replacement. Scope has a power supply fault, and probably needs a capacitor replacement.
  
-==== Repair Rigol oscilloscope ====+==== Repair Rigol DS1102D oscilloscope ====
  
 One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.
Line 34: Line 45:
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways 
-  * Sort the PC parts and peripherals 
   * Build a webapp to view [[http://spaceapi.net|Space API]] data   * Build a webapp to view [[http://spaceapi.net|Space API]] data
  
----- +===== Radio / Antenna TODO ==== 
- +https://wiki.ehlab.uk/roof 
-===== Completed Projects ===== +https://wiki.ehlab.uk/radio:projects
- +
-==== Fit shelving under G8 workbenches ==== +
- +
-We want to install shelving under the section of workbench to the right of the drill pressJust one shelf, to divide the space into two+
- +
-==== Relocate extraction vent in G11 Store Room ==== +
- +
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot airWe have an extra length of flexible hose that should enable this.+
  
-==== Install ventilation in G8 Workshop ====+===== Roundup =====
  
-We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed.+The roundup tracker has been dropped due to lack of useThe archived list of open issues is as follows:
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. 
-  * Source a suitable fan. 
-  * Do the work... 
-  * Clean/repaint as required. 
  
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 |
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 |
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 |
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 |
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 |
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 |
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 |
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 |
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 |
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 |
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 |
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 |
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 |
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 |
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 |
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 |
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 |
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 |
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 |
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 |
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 |
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 |
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 |
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 |
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 |
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 |
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 |
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 |
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 |
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 |
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 |
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 |
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 |
  
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |