User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2016-09-27 09:45] timtodo [2022-07-04 19:30] (current) MirZa
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also the [[members_nights|Members' Nights]] list.
  
-==== Fit shelving under G8 workbenches ====+===== Small Tasks =====
  
-We want to install shelving under the section of workbench to the right of the drill press. Just one shelf, to divide the space into two.+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-StatusTim has fitted frame and started cutting the boards to make the shelves.+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have surplus and the shelf would be more secure).
  
-==== Drill organisation ==== 
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing.+===== Bigger Tasks =====
  
-  * Make or buy an organiser: +These should be immediately actionable, describable in single bullet point and take 1-3 hours for 1-2 people to complete:
-    * Multiple holes for each size of drill (because one drill of each size is not enough for hackerspace) +
-    * Sections for HSS, brad-point and masonry +
-  * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares. +
-  * Identify a suitable drill sharpening system to keep the drills in good condition.+
  
-==== Install ventilation in G8 Workshop ====+  * Pull additional Cat5 cables from between G11 and G14. 
 +  * Tidy-up the radio corner. 
 +  * Fix Volume control / MQTT-IR bridge 
 +  * Fix Projector control
  
-We have permission from Summerhall to install a fan in the external wall. There are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed. 
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. +===== Infrastructure Projects =====
-  * Source a suitable fan. +
-  * Do the work... +
-  * Clean/repaint as required.+
  
-==== Relocate extraction vent in G11 Store Room ====+  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
  
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this.+More tasks may be found on the [[start#projects|infrastructure project pages]].
  
-==== Finish moving the workshop from G2 to G8 ====+===== Mini Projects =====
  
-  * Mount the wall-mounted bins in G8 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here. 
-  * Move the tools and supplies from G2 to G8 + 
-  * Organise the shelves in G8label them so tools can be returned to the same place each time+==== Repair Tektronix oscilloscope ==== 
-  * Move the chemicals from G1 to G8 (under the sink)Dispose of empty containers+ 
-  * Fit a smoke alarm in G8 (early warning system to avoid causing an evac of Summerhall).+Scope has a power supply faultand probably needs a capacitor replacement
 + 
 +==== Repair Rigol DS1102D oscilloscope ==== 
 + 
 +One channel has failed, believed to be in the front-endDevice is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while
 + 
 +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals+ 
 +===== Radio / Antenna TODO ==== 
 +https://wiki.ehlab.uk/roof 
 +https://wiki.ehlab.uk/radio:projects 
 + 
 +===== Roundup ===== 
 + 
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: 
 + 
 + 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | 
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | 
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | 
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | 
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | 
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | 
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | 
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | 
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | 
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | 
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | 
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | 
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | 
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | 
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | 
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | 
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | 
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | 
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | 
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | 
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | 
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | 
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | 
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | 
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | 
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | 
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | 
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | 
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 |
  
 +(Mostly) Done tasks
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 |
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 |
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 |
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 |
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 |
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 |
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 |
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 |
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 |
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
todo.1474969535.txt.gz · Last modified: 2016-09-27 09:45 by tim

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki