User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2016-09-27 09:38] timtodo [2022-07-04 19:30] (current) MirZa
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== Mini Projects =====+See also the [[members_nights|Members' Nights]] list.
  
-==== Fit shelving under G8 workbenches ====+===== Small Tasks =====
  
-Status: in progressTim+These should be immediately actionabledescribable in a single bullet point and take up to 30 minutes for one person to complete:
  
-==== Drill organisation ====+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelves: replace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
  
-All of our drills (bits) currently sit in a single box. We should have a storage system for making it easier to find the right type and size, and to see what we have or what is missing. 
  
-  * Make or buy an organiser: +===== Bigger Tasks =====
-    * Multiple holes for each size of drill (because one drill of each size is not enough for a hackerspace) +
-    * Sections for HSS, brad-point and masonry +
-  * Audit the drills. Dispose of bad ones. Sharpen where possible. Identify what we need to purchase for replacements/spares. +
-  * Identify a suitable drill sharpening system to keep the drills in good condition.+
  
-==== Install ventilation in G8 Workshop ====+These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:
  
-We have permission from Summerhall to install a fan in the external wallThere are two sections where previous vents have been bricked-up, and one of these should be opened and a fan installed.+  * Pull additional Cat5 cables from between G11 and G14. 
 +  * Tidy-up the radio corner. 
 +  * Fix Volume control / MQTT-IR bridge 
 +  * Fix Projector control
  
-  * Plan how to remove the bricks safely and without damaging the rest of the wall. 
-  * Source a suitable fan. 
-  * Do the work... 
-  * Clean/repaint as required. 
  
-==== Relocate extraction vent in G11 Store Room ====+===== Infrastructure Projects =====
  
-The extract vent is currently located in the left corner as you enter the room. It should be relocate to the tile above the rear of the server rack, to better capture the hot air. We have an extra length of flexible hose that should enable this.+  * Add a shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it
  
-===== New Room =====+More tasks may be found on the [[start#projects|infrastructure project pages]].
  
-G11:+===== Mini Projects =====
  
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim]+Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.
  
-G8:+==== Repair Tektronix oscilloscope ====
  
-  * Arrange disposal/re-homing of the desks [Al] +Scope has a power supply fault, and probably needs capacitor replacement. 
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> + 
-    * Fit an external extractor fan (permission has been granted by Summerhall) +==== Repair Rigol DS1102D oscilloscope ==== 
-  * Build dust extraction system to capture dust from the power tools + 
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause building evacuation +One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. 
-  * Build a standalone workbench (either 150x75cm or 180x75cm) + 
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals + 
-  <del>Make some door wedges</del>+===== Radio / Antenna TODO ==== 
 +https://wiki.ehlab.uk/roof 
 +https://wiki.ehlab.uk/radio:projects 
 + 
 +===== Roundup ===== 
 + 
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: 
 + 
 + 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | 
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | 
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | 
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | 
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | 
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | 
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | 
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | 
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | 
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | 
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | 
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | 
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | 
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | 
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | 
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | 
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | 
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | 
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | 
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | 
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | 
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | 
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | 
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | 
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | 
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | 
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | 
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | 
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 | 
 + 
 +(Mostly) Done tasks 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | 
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
todo.1474969114.txt.gz · Last modified: 2016-09-27 09:38 by tim

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki