User Tools

Site Tools


todo

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
todo [2016-09-11 22:55] timtodo [2022-07-04 19:30] (current) MirZa
Line 1: Line 1:
-====== Things To Do How Can Help? ======+====== To-Do (How can help?======
  
-===== New Room =====+See also the [[members_nights|Members' Nights]] list.
  
-G11:+===== Small Tasks =====
  
-  * Fit PIR sensor <del>and door-closed sensor</del> to G11 [Tim]+These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:
  
-G8:+  * Tidy and clear-out the kitchen cupboard. Should only contain cleaning supplies. 
 +  * G1 hifi shelvesreplace the short brackets with long brackets (we have a surplus and the shelf would be more secure).
  
-  Arrange disposal/re-homing of the desks [Al] + 
-  * <del>Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)</del> +===== Bigger Tasks ===== 
-    Fit an external extractor fan (permission has been granted by Summerhall) + 
-  * Build dust extraction system to capture dust from the power tools +These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete: 
-  * Purchase and install sensitive smoke alarm(s) to warn us before we cause building evacuation + 
-  * Build standalone workbench (either 150x75cm or 180x75cm) +  Pull additional Cat5 cables from between G11 and G14. 
-  * Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)+  * Tidy-up the radio corner. 
 +  * Fix Volume control MQTT-IR bridge 
 +  Fix Projector control 
 + 
 + 
 +===== Infrastructure Projects ===== 
 + 
 +  * Add shelly smart switch to G11 (possibly G14). Doesn't have to connect to MQTT, just turn off after set amount of time as G11 is where people leave the lights on the most 
 +  * Add a smart switch to extractor fan in G11, move the plug inside the ceiling and add a button to control it 
 + 
 +More tasks may be found on the [[start#projects|infrastructure project pages]]. 
 + 
 +===== Mini Projects ===== 
 + 
 +Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and link from here. 
 + 
 +==== Repair Tektronix oscilloscope ==== 
 + 
 +Scope has power supply fault, and probably needs a capacitor replacement. 
 + 
 +==== Repair Rigol DS1102D oscilloscope ==== 
 + 
 +One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while. 
 + 
 +This schematic might help: http://rigol.codenaschen.de/index.php/Schematics
  
 ===== Other Stuff ===== ===== Other Stuff =====
  
   * Design a test pattern for checking/calibrating the laser cutter   * Design a test pattern for checking/calibrating the laser cutter
-  * Update OpenStreepMap to identify all the local takeaways +  * Build a webapp to view [[http://spaceapi.net|Space API]] data 
-  * Sort the PC parts and peripherals + 
-  <del>Make some door wedges</del>+===== Radio / Antenna TODO ==== 
 +https://wiki.ehlab.uk/roof 
 +https://wiki.ehlab.uk/radio:projects 
 + 
 +===== Roundup ===== 
 + 
 +The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows: 
 + 
 + 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 94 | 2018-06-03.16:36:02 | COSHH Register / Chemicals | 22 | None | 3 | 
 +| 99 | 2018-06-03.10:17:27 | Fire safety policy | 22 | None | 3 | 
 +| 93 | 2018-06-03.10:09:49 | Update health and safety policy | 22 | None | 3 | 
 +| 95 | 2018-06-03.10:05:17 | Near miss / accident register & policy | 22 | None | 3 | 
 +| 98 | 2018-06-03.09:31:42 | Electrical Testing / PAT Testing policy / training | 22 | 22 | 3 | 
 +| 96 | 2018-06-03.09:21:59 | Electrical Safety Policy | 22 | None | 3 | 
 +| 54 | 2017-12-08.15:50:13 | Create training docs for mitre saw | 4 | None | 1 | 
 +| 52 | 2017-12-08.15:49:11 | Create training docs for table saw | 4 | None | 1 | 
 +| 56 | 2018-08-04.18:02:06 | Create training docs for bantam lathe | 4 | None | 3 | 
 +| 17 | 2018-06-28.15:45:34 | Tidy roof radio/network equipment | 3 | None | 3 | 
 +| 73 | 2018-04-27.12:15:35 | Maintenance on Block B roof ladder | 3 | None | 1 | 
 +| 11 | 2018-01-19.00:04:51 | Repair Tektronix oscilloscope | 3 | None | 3 | 
 +| 33 | 2017-06-28.00:23:48 | Organise chemical storage and COSHH docs | 3 | None | 1 | 
 +| 32 | 2017-06-27.23:46:31 | Organise cleaning cupboard | 3 | None | 1 | 
 +| 97 | 2018-06-03.09:28:59 | Membership Policy | 21 | 21 | 1 | 
 +| 28 | 2018-05-22.09:46:27 | Close out the milling pledge | 4 | None | 5 | 
 +| 9 | 2018-05-22.09:46:13 | Collect remaining mitre saw pledges | 3 | None | 5 | 
 +| 67 | 2018-05-01.19:57:43 | Remote antenna switch for roof->g1 downlink | 3 | None | 3 | 
 +| 89 | 2018-04-25.13:30:09 | Mailman 3 mailing lists | 3 | 3 | 3 | 
 +| 104 | 2019-05-17.14:30:44 | (Sliding) doors under benches in G8 | 45 | None | 1 | 
 +| 63 | 2018-12-18.14:30:07 | Build new test lead organisation fixture | 23 | None | 3 | 
 +| 69 | 2018-07-18.13:23:09 | SatNOGS station | 3 | None | 3 | 
 +| 92 | 2018-04-27.12:10:08 | Name Badge Printer / Visitor Sign In | 22 | None | 1 | 
 +| 90 | 2018-04-25.14:42:53 | Consumables Inventory | 23 | None | 3 | 
 +| 61 | 2018-03-31.05:57:11 | Build new terminal unit for HP bench power supply | 3 | None | 3 | 
 +| 26 | 2018-03-03.01:07:58 | Install roof-top weather station | 3 | 10 | 3 | 
 +| 60 | 2018-01-25.15:21:14 | Obtain BNC cables and such for Oscilloscope/Signal Generators | 23 | None | 3 | 
 +| 58 | 2018-01-03.00:14:14 | Purchase vacuum desoldering pump | 3 | None | 1 | 
 +| 70 | 2018-01-26.03:13:28 | Fix CNC spindle probe | 4 | 4 | 5 | 
 +| 87 | 2018-04-24.18:00:42 | CNC router z-axis counterweight or brake | 4 | None | 1 | 
 +| 83 | 2018-04-24.18:17:54 | Spindle/VFD control from LinuxCNC | 4 | None | 1 | 
 +| 86 | 2018-04-24.18:17:45 | Tool touchoff pad for the CNC router | 4 | None | 1 | 
 +| 59 | 2018-02-02.15:45:46 | Replace taps in G8 <del>and G11</del> | 21 | None | 3 | 
 + 
 +(Mostly) Done tasks 
 +^ id ^ activity ^ title ^ creator ^ assigned to ^ status ^ 
 +| 79 | 2018-04-14.20:48:15 | Fix Ultimaker 2 LED Strips | 23 | None | 1 | 
 +| 30 | 2017-06-11.16:09:24 | 3D Printing Supplies | 15 | 15 | 1 | 
 +| 4 | 2017-04-24.14:00:20 | Fix the NovaTurn CNC lathe | 4 | None | 1 | 
 +| 102 | 2019-03-23.11:45:06 | test subject | 3 | 3 | 3 | 
 +| 39 | 2019-03-09.18:45:32 | "Update ""Facilities"" page on the website" | 19 | None | 3 | 
 +| 88 | 2018-04-24.18:02:49 | Set up PC for the CNC router | 4 | None | 1 | 
 +| 85 | 2018-04-24.17:56:03 | CNC router dust extraction | 4 | None | 1 | 
 +| 84 | 2018-04-24.17:55:39 | CNC router power/e-stop wiring | 4 | None | 3 | 
 +| 82 | 2018-04-24.17:47:53 | Watercooling for the CNC router | 4 | None | 1 | 
 +| 24 | 2018-04-13.09:54:56 | Automated do-not-hack stickers | 3 | 3 | 3 |
todo.1473634512.txt.gz · Last modified: 2016-09-11 22:55 (external edit)