Things To Do / How Can I Help?
New Room
G11:
- Fit PIR sensor
and door-closed sensorto G11 [Tim]
G8:
- Arrange disposal/re-homing of the desks [Al]
Build an air filtering system to capture dust (since G8 doesn't have extraction or a window)- Fit an external extractor fan (permission has been granted by Summerhall)
- Build a dust extraction system to capture dust from the power tools
- Purchase and install sensitive smoke alarm(s) to warn us before we cause a building evacuation
- Build a standalone workbench (either 150x75cm or 180x75cm)
- Fit shelf under right-section of new workbenches (40cm depth, wall-mounted)
Other Stuff
- Design a test pattern for checking/calibrating the laser cutter
- Update OpenStreepMap to identify all the local takeaways
- Sort the PC parts and peripherals
Make some door wedges