User Tools

Site Tools


network2017

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
network2017 [2017-01-15 16:20]
tim [New Rack layout]
network2017 [2017-01-16 16:22] (current)
tim [Circuit Re-balancing]
Line 44: Line 44:
   * Identify suitable back-boxes for cable conduit: [[http://​www.cmsplc.com/​trunking-systems/​maxi-trunking/​cabledec-maxi-trunking/​cabledec-plus-maxi-trunking-accessory-boxes.html|cmsplc.com]]   * Identify suitable back-boxes for cable conduit: [[http://​www.cmsplc.com/​trunking-systems/​maxi-trunking/​cabledec-maxi-trunking/​cabledec-plus-maxi-trunking-accessory-boxes.html|cmsplc.com]]
   * Purchase back-boxes, twin sockets, additional cable   * Purchase back-boxes, twin sockets, additional cable
-    * 3x twin backboxes (plus 2x twin and 1x single spares for future projects)+    * <del>3x twin backboxes (plus 2x twin and 1x single spares for future projects)</​del>​
     * 3x http://​cpc.farnell.com/​crabtree/​4306-d/​2g-dp-switched-skt-13a/​dp/​PL11953     * 3x http://​cpc.farnell.com/​crabtree/​4306-d/​2g-dp-switched-skt-13a/​dp/​PL11953
-    * 2.5mm multipack: http://​www.ebay.co.uk/​itm/​6491X-1-5mm-2-5mm-4mm-Single-Core-Conduit-Cable-Wire-Green-Yellow-Earth-/​262253607970+    * <del>2.5mm multipack: http://​www.ebay.co.uk/​itm/​6491X-1-5mm-2-5mm-4mm-Single-Core-Conduit-Cable-Wire-Green-Yellow-Earth-/​262253607970</​del>​
   * Arrange access to plant room to switch-off power   * Arrange access to plant room to switch-off power
   * Schedule downtime (can be mitigated by running essential systems from another circuit)   * Schedule downtime (can be mitigated by running essential systems from another circuit)
network2017.txt ยท Last modified: 2017-01-16 16:22 by tim