Line 24: | Line 24: | ||
* Replacement Hacklab router (assuming a 1U full-depth) can go mid-rack | * Replacement Hacklab router (assuming a 1U full-depth) can go mid-rack | ||
* fit two high-capacity PDUs, attached to different circuits | * fit two high-capacity PDUs, attached to different circuits | ||
- | * e.g. 2x 12x IEC [[http:// | + | * <del>e.g. 2x 12x IEC [[http:// |
+ | * e.g. 2x 12x IEC [[http:// | ||
==== New Shelf layout ==== | ==== New Shelf layout ==== | ||
Line 43: | Line 44: | ||
* Identify suitable back-boxes for cable conduit: [[http:// | * Identify suitable back-boxes for cable conduit: [[http:// | ||
* Purchase back-boxes, twin sockets, additional cable | * Purchase back-boxes, twin sockets, additional cable | ||
- | * 3x twin backboxes (plus 2x twin and 1x single spares for future projects) | + | * <del>3x twin backboxes (plus 2x twin and 1x single spares for future projects)</ |
* 3x http:// | * 3x http:// | ||
- | * 2.5mm multipack: http:// | + | * <del>2.5mm multipack: http:// |
* Arrange access to plant room to switch-off power | * Arrange access to plant room to switch-off power | ||
* Schedule downtime (can be mitigated by running essential systems from another circuit) | * Schedule downtime (can be mitigated by running essential systems from another circuit) |