User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
members_nights [2019-02-13 15:48]
tim [Activity Ideas]
members_nights [2019-04-08 15:42] (current)
tim
Line 17: Line 17:
 Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it.
  
-<​del>​Saturday 2nd February, 3pm</​del>​ | +**Thursday ​11th April, 7pm** 
-Thursday ​14th February, 7pm | +| Saturday ​27th April, 3pm | 
-| Saturday ​2nd March, 3pm | +| Thursday ​9th May, 7pm |
-| Thursday ​14th March, 7pm | +
-| Saturday 30th March, 3pm | +
-| Thursday 11th April, 7pm |+
 | ... | | ... |
  
Line 32: Line 29:
     * Re-stock the shop     * Re-stock the shop
     * Install CAT5 cables:     * Install CAT5 cables:
-      * 4x CAT5e between G1 (above door) and G11 (rack)+      * <del>4x CAT5e between G1 (above door) and G11 (rack)</​del>​
       * 2x CAT5e from G1 (above door) to G1 Window patch points       * 2x CAT5e from G1 (above door) to G1 Window patch points
-    * Radio corner: remove wooden drawer unit to allow proper access to screwdrivers+    * <del>Radio corner: remove wooden drawer unit to allow proper access to screwdrivers</​del>​ 
 +    * Electronics:​ sort/​organise/​purge the electronics storage (shelves above work area, shelves behind door) 
 +    * Organise "Tapes and Glues" drawer. 
 +    * Organise kitchen shelves: 
 +      * reduce teas to one 9L box 
 +      * reduce coffee/​hot-chocolate to one 9L box 
 +      * try and create enough space that dishes can be stacked separately from plates 
 +    * Deep-clean and restore the whiteboard 
 +    * Radio Corner: 
 +        * Install shelves 
 +        * Install decent RF earth (pipework?​) 
  
   * Workshop   * Workshop
Line 40: Line 48:
     * Empty the vacuum cleaners and dust extractor     * Empty the vacuum cleaners and dust extractor
     * Sort the junk pile underneath the CNC router     * Sort the junk pile underneath the CNC router
-    * Organise the boxes of power tools+    * Organise the boxes of power tools (small and closed boxes instead of a single pile) 
 +    * <​del>​Test/​fit Sonoff fan controller (for the wall extractor fan)</​del>​ 
 +    * Training docs for table saw 
 +    * Training docs for mitre saw 
 +    * Install CNC router
  
   * Laser Room   * Laser Room
     * Sort scrap materials     * Sort scrap materials
     * Empty bins     * Empty bins
 +    * Build a tool controller for small laser cutter
  
   * Store Room   * Store Room
-    * Install shelves above 3D printers+    * <del>Install shelves above 3D printers</​del>​
     * Sort PC & computer stock     * Sort PC & computer stock
     * Sort AV equipment     * Sort AV equipment
    
   * Train lab users on the restricted tools   * Train lab users on the restricted tools
-  * Install shelves in radio corner 
-  * Assemble additional tool access controllers 
-  * Install CNC router 
   * Collaborate on policy documentation   * Collaborate on policy documentation
-  * Work together on new training documents 
   * SatNOGS antenna rotator   * SatNOGS antenna rotator
   * Build a stand for the traffic lights that will allow them to be installed outside   * Build a stand for the traffic lights that will allow them to be installed outside
 +  * Assemble additional tool access controllers
   * Install a new antenna mounting frame on the roof   * Install a new antenna mounting frame on the roof
   * Install lockers for secure tool storage   * Install lockers for secure tool storage
members_nights.1550072917.txt.gz · Last modified: 2019-02-13 15:48 by tim