User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
members_nights [2019-02-13 15:48] – [Activity Ideas] timmembers_nights [2019-04-08 15:42] tim
Line 17: Line 17:
 Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it.
  
-<del>Saturday 2nd February, 3pm</del>+**Thursday 11th April, 7pm** 
-Thursday 14th February, 7pm | +| Saturday 27th April, 3pm | 
-| Saturday 2nd March, 3pm | +| Thursday 9th May, 7pm |
-| Thursday 14th March, 7pm | +
-| Saturday 30th March, 3pm | +
-| Thursday 11th April, 7pm |+
 | ... | | ... |
  
Line 32: Line 29:
     * Re-stock the shop     * Re-stock the shop
     * Install CAT5 cables:     * Install CAT5 cables:
-      * 4x CAT5e between G1 (above door) and G11 (rack)+      * <del>4x CAT5e between G1 (above door) and G11 (rack)</del>
       * 2x CAT5e from G1 (above door) to G1 Window patch points       * 2x CAT5e from G1 (above door) to G1 Window patch points
-    * Radio corner: remove wooden drawer unit to allow proper access to screwdrivers+    * <del>Radio corner: remove wooden drawer unit to allow proper access to screwdrivers</del> 
 +    * Electronics: sort/organise/purge the electronics storage (shelves above work area, shelves behind door) 
 +    * Organise "Tapes and Glues" drawer. 
 +    * Organise kitchen shelves: 
 +      * reduce teas to one 9L box 
 +      * reduce coffee/hot-chocolate to one 9L box 
 +      * try and create enough space that dishes can be stacked separately from plates 
 +    * Deep-clean and restore the whiteboard 
 +    * Radio Corner: 
 +        * Install shelves 
 +        * Install decent RF earth (pipework?
  
   * Workshop   * Workshop
Line 40: Line 48:
     * Empty the vacuum cleaners and dust extractor     * Empty the vacuum cleaners and dust extractor
     * Sort the junk pile underneath the CNC router     * Sort the junk pile underneath the CNC router
-    * Organise the boxes of power tools+    * Organise the boxes of power tools (small and closed boxes instead of a single pile) 
 +    * <del>Test/fit Sonoff fan controller (for the wall extractor fan)</del> 
 +    * Training docs for table saw 
 +    * Training docs for mitre saw 
 +    * Install CNC router
  
   * Laser Room   * Laser Room
     * Sort scrap materials     * Sort scrap materials
     * Empty bins     * Empty bins
 +    * Build a tool controller for small laser cutter
  
   * Store Room   * Store Room
-    * Install shelves above 3D printers+    * <del>Install shelves above 3D printers</del>
     * Sort PC & computer stock     * Sort PC & computer stock
     * Sort AV equipment     * Sort AV equipment
    
   * Train lab users on the restricted tools   * Train lab users on the restricted tools
-  * Install shelves in radio corner 
-  * Assemble additional tool access controllers 
-  * Install CNC router 
   * Collaborate on policy documentation   * Collaborate on policy documentation
-  * Work together on new training documents 
   * SatNOGS antenna rotator   * SatNOGS antenna rotator
   * Build a stand for the traffic lights that will allow them to be installed outside   * Build a stand for the traffic lights that will allow them to be installed outside
 +  * Assemble additional tool access controllers
   * Install a new antenna mounting frame on the roof   * Install a new antenna mounting frame on the roof
   * Install lockers for secure tool storage   * Install lockers for secure tool storage
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki