User Tools

Site Tools


members_nights

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
members_nights [2019-01-21 01:16] timmembers_nights [2019-03-17 14:53] tim
Line 17: Line 17:
 Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it. Alternating between Thu 19:00 and Sat 15:00, three hours in length. Start slow with a session every two weeks, increase to weekly if we can sustain it.
  
-Dates under consideration and subject to confirmation... +**Saturday 30th March, 3pm** |
- +
-| Saturday 2nd February, 3pm | +
-| Thursday 14th February, 7pm | +
-| Saturday 2th March, 3pm | +
-| Thursday 14th March, 7pm | +
-| Saturday 30th March, 3pm |+
 | Thursday 11th April, 7pm | | Thursday 11th April, 7pm |
 +| Saturday 27th April, 3pm |
 +| Thursday 9th May, 7pm |
 | ... | | ... |
  
 ===== Activity Ideas ===== ===== Activity Ideas =====
  
-  * Cleaning and tidying (always a worthwhile contribution+  * Main Room 
-    * Empty laser materials bin +    * Tidy all the surfaces 
-    * Sort laser material scrap +    * Remove out of date food from the fridge 
-    * Sweep/vacuum corridor+    * Re-stock the shop 
 +    * Install CAT5 cables: 
 +      * <del>4x CAT5e between G1 (above door) and G11 (rack)</del> 
 +      * 2x CAT5e from G1 (above door) to G1 Window patch points 
 +    * <del>Radio corner: remove wooden drawer unit to allow proper access to screwdrivers</del> 
 +    * Electronics: sort/organise/purge the electronics storage (shelves above work area, shelves behind door) 
 +    * Organise "Tapes and Glues" drawer. 
 +    * Organise kitchen shelves: 
 +      * reduce teas to one 9L box 
 +      * reduce coffee/hot-chocolate to one 9L box 
 +      * try and create enough space that dishes can be stacked separately from plates 
 + 
 +  * Workshop 
 +    * Tidy all the surfaces 
 +    * Empty the vacuum cleaners and dust extractor 
 +    * Sort the junk pile underneath the CNC router 
 +    * Organise the boxes of power tools (small and closed boxes instead of a single pile) 
 +    * Test/fit Sonoff fan controller (for the wall extractor fan) 
 +    * <del>Finish bandsaw training material</del> 
 +    * Train users on the big bandsaw 
 +    * Training docs for table saw 
 +    * Training docs for mitre saw 
 +    * Install CNC router 
 + 
 +  * Laser Room 
 +    * Sort scrap materials 
 +    * Empty bins 
 +    * Build a tool controller for small laser cutter 
 + 
 +  * Store Room 
 +    * <del>Install shelves above 3D printers</del>
     * Sort PC & computer stock     * Sort PC & computer stock
-    * Sort other materials in store room +    * Sort AV equipment 
-    * Tidy and clean workshop +  
-  * Install shelves behind 3D printers+  * Train lab users on the restricted tools
   * Install shelves in radio corner   * Install shelves in radio corner
 +  * Collaborate on policy documentation
   * SatNOGS antenna rotator   * SatNOGS antenna rotator
   * Build a stand for the traffic lights that will allow them to be installed outside   * Build a stand for the traffic lights that will allow them to be installed outside
-  * Install a new antenna mounting frame on the roof 
   * Assemble additional tool access controllers   * Assemble additional tool access controllers
-  * Install lockers for secure tool storage (starting with the building of pigeonhole shelving) +  * Install a new antenna mounting frame on the roof 
-  * Collaborate on policy documentation +  * Install lockers for secure tool storage 
-  * Train lab users on the restricted tools + 
-  * Work together on new training documents+Look for more ideas at https://roundup.ehlab.uk/ 
members_nights.txt · Last modified: 2020-02-29 11:15 by alfie

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki