g1_flooring
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
g1_flooring [2019-06-21 21:38] – [Volunteers & Shifts] alfie | g1_flooring [2019-07-02 10:37] – tim | ||
---|---|---|---|
Line 3: | Line 3: | ||
The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it. | The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it. | ||
- | Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. | + | Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. |
+ | |||
+ | Floor area 9.1x4.2m = 38.22m². | ||
====== THE PLAN ====== | ====== THE PLAN ====== | ||
Line 41: | Line 43: | ||
| Taisiya | No | No | Yes | No | No | | | Taisiya | No | No | Yes | No | No | | ||
| David | No | No | No | Maybe | Maybe | | | David | No | No | No | Maybe | Maybe | | ||
- | | Simon | No | Maybe | Maybe | No | No | | ||
---- | ---- |