 The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.  ​ The flooring in G1 is rapidly deteriorating. At the 2019 AGM, it was decided that the floor needs to be fixed: Alfie was appointed to organise fixing the floor in G1, which means deciding how to fix it and wrangling members into fixing it.  ​
  
-Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully. ​+Alfie knows next to nothing about floors, so this wiki page chronicles Alfie Learning These Things And Fixing The Floor, Hopefully
 + 
 +Floor area 9.1x4.2m = 38.22m².
  
 ====== THE PLAN ====== ====== THE PLAN ======