bantam_lathe_moving_plan
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
bantam_lathe_moving_plan [2016-09-28 23:22] – [Lifting/moving] mike | bantam_lathe_moving_plan [2016-09-29 22:40] (current) – [Lifting/moving] mike | ||
---|---|---|---|
Line 9: | Line 9: | ||
The {{ : | The {{ : | ||
- | Lifting options | + | Options: |
* 2-ton engine hoist | * 2-ton engine hoist | ||
* Someone probably has one we can borrow, or we can rent/buy | * Someone probably has one we can borrow, or we can rent/buy | ||
Line 22: | Line 22: | ||
* No metal on metal, there must be some ply or cardboard or something to stop it slipping on the forks. | * No metal on metal, there must be some ply or cardboard or something to stop it slipping on the forks. | ||
* Lathe is going to be very top-heavy. | * Lathe is going to be very top-heavy. | ||
+ | * Luton van + tail lift | ||
+ | * £85/day @ Condor - http:// | ||
+ | * Dollies | ||
+ | * For easy moving around on the ground/in buildings | ||
+ | * Should be wide enough so we can bolt into them through the lathe' | ||
+ | * Ready-made ones all seem expensive | ||
+ | * Sets of heavy-duty castors are cheap for DIY efforts. | ||
===== At Portobello ===== | ===== At Portobello ===== |
bantam_lathe_moving_plan.txt · Last modified: 2016-09-29 22:40 by mike