Table of Contents

To-Do (How can I help?)

See also the Members' Nights list.

Small Tasks

These should be immediately actionable, describable in a single bullet point and take up to 30 minutes for one person to complete:

Bigger Tasks

These should be immediately actionable, describable in a single bullet point and take 1-3 hours for 1-2 people to complete:

Infrastructure Projects

More tasks may be found on the infrastructure project pages.

Mini Projects

Projects might require planning or additional purchases before they can be tackled. Some projects will need their own pages and a link from here.

Repair Tektronix oscilloscope

Scope has a power supply fault, and probably needs a capacitor replacement.

Repair Rigol DS1102D oscilloscope

One channel has failed, believed to be in the front-end. Device is out of warranty and Rigol cannot offer replacement parts that would be economically worth-while.

This schematic might help: http://rigol.codenaschen.de/index.php/Schematics

Other Stuff

Radio / Antenna TODO

https://wiki.ehlab.uk/roof https://wiki.ehlab.uk/radio:projects

Roundup

The roundup tracker has been dropped due to lack of use. The archived list of open issues is as follows:

id activity title creator assigned to status
94 2018-06-03.16:36:02 COSHH Register / Chemicals 22 None 3
99 2018-06-03.10:17:27 Fire safety policy 22 None 3
93 2018-06-03.10:09:49 Update health and safety policy 22 None 3
95 2018-06-03.10:05:17 Near miss / accident register & policy 22 None 3
98 2018-06-03.09:31:42 Electrical Testing / PAT Testing policy / training 22 22 3
96 2018-06-03.09:21:59 Electrical Safety Policy 22 None 3
54 2017-12-08.15:50:13 Create training docs for mitre saw 4 None 1
52 2017-12-08.15:49:11 Create training docs for table saw 4 None 1
56 2018-08-04.18:02:06 Create training docs for bantam lathe 4 None 3
17 2018-06-28.15:45:34 Tidy roof radio/network equipment 3 None 3
73 2018-04-27.12:15:35 Maintenance on Block B roof ladder 3 None 1
11 2018-01-19.00:04:51 Repair Tektronix oscilloscope 3 None 3
33 2017-06-28.00:23:48 Organise chemical storage and COSHH docs 3 None 1
32 2017-06-27.23:46:31 Organise cleaning cupboard 3 None 1
97 2018-06-03.09:28:59 Membership Policy 21 21 1
28 2018-05-22.09:46:27 Close out the milling pledge 4 None 5
9 2018-05-22.09:46:13 Collect remaining mitre saw pledges 3 None 5
67 2018-05-01.19:57:43 Remote antenna switch for roof→g1 downlink 3 None 3
89 2018-04-25.13:30:09 Mailman 3 mailing lists 3 3 3
104 2019-05-17.14:30:44 (Sliding) doors under benches in G8 45 None 1
63 2018-12-18.14:30:07 Build new test lead organisation fixture 23 None 3
69 2018-07-18.13:23:09 SatNOGS station 3 None 3
92 2018-04-27.12:10:08 Name Badge Printer / Visitor Sign In 22 None 1
90 2018-04-25.14:42:53 Consumables Inventory 23 None 3
61 2018-03-31.05:57:11 Build new terminal unit for HP bench power supply 3 None 3
26 2018-03-03.01:07:58 Install roof-top weather station 3 10 3
60 2018-01-25.15:21:14 Obtain BNC cables and such for Oscilloscope/Signal Generators 23 None 3
58 2018-01-03.00:14:14 Purchase vacuum desoldering pump 3 None 1
70 2018-01-26.03:13:28 Fix CNC spindle probe 4 4 5
87 2018-04-24.18:00:42 CNC router z-axis counterweight or brake 4 None 1
83 2018-04-24.18:17:54 Spindle/VFD control from LinuxCNC 4 None 1
86 2018-04-24.18:17:45 Tool touchoff pad for the CNC router 4 None 1
59 2018-02-02.15:45:46 Replace taps in G8 and G11 21 None 3

(Mostly) Done tasks

id activity title creator assigned to status
79 2018-04-14.20:48:15 Fix Ultimaker 2 LED Strips 23 None 1
30 2017-06-11.16:09:24 3D Printing Supplies 15 15 1
4 2017-04-24.14:00:20 Fix the NovaTurn CNC lathe 4 None 1
102 2019-03-23.11:45:06 test subject 3 3 3
39 2019-03-09.18:45:32 “Update ”“Facilities”“ page on the website” 19 None 3
88 2018-04-24.18:02:49 Set up PC for the CNC router 4 None 1
85 2018-04-24.17:56:03 CNC router dust extraction 4 None 1
84 2018-04-24.17:55:39 CNC router power/e-stop wiring 4 None 3
82 2018-04-24.17:47:53 Watercooling for the CNC router 4 None 1
24 2018-04-13.09:54:56 Automated do-not-hack stickers 3 3 3